Road widening of Imperial Street at Patterson Avenue to accommodate left turn bays. Works include the construction of 225m of concrete curb and 350m2 of concrete sidewalk, 455m2 of road widening and pavement rehabilitation comprising 230t of asphalt, 7 catch basins with PVC leads, relocation of traffic signal arms and lighting, construction of a block retaining wall, and tree removal.
TMPs were designed for multiple locations within the City of Burnaby.